LEED v5 for Building Design and Construction makes refrigerant management a prerequisite for every New Construction and Core and Shell project, then awards up to 2 more points for going further. The prerequisite requires a refrigerant inventory, no HCFCs in new equipment, a review of alternatives for any refrigerant above 700 GWP, and leak checks before substantial completion. GreenCE lists a free course on this subject, “Navigating the HVAC Transition: Low-GWP Refrigerants, Regulatory Trends, and Sustainable Building Practices,” which carries a GBCI general hour.
What does the Fundamental Refrigerant Management prerequisite (EAp5) require?
Either no refrigerants at all, or four actions. Projects using refrigerants must:
- Inventory the refrigerant-containing equipment in the project scope and any existing equipment the owner holds: refrigerant type, GWP, charge in each unit and the total GWP.
- Exclude HCFCs from new equipment.
- Evaluate alternatives during design for any refrigerant with GWP above 700.
- Leak check and repair new and existing equipment before substantial completion; systems with field-assembled joints also need a leak, vacuum and pressure check before charging.
The prerequisite does not ban high-GWP refrigerants. It requires the team to document them and look at alternatives.
How do you earn the Enhanced Refrigerant Management credit (EAc7)?
Through any mix of three options, for up to 2 points in New Construction or Core and Shell:
| Option | What it takes | Points |
|---|---|---|
| 1, Path 1: No refrigerants | No refrigerant-containing equipment in the project | 1 |
| 1, Path 2: Low-GWP refrigerants | Weighted average GWP of all new equipment at or below 80% (1 point) or 50% (2 points) of the benchmark average | 1–2 |
| 2: Limit refrigerant leakage | Design, installation and operating measures listed below | 1 |
| 3: GreenChill certification | Food retail over 20% of gross area; Silver = 1, Gold or Platinum = 2 | 1–2 |
For Core and Shell, the no-refrigerants path is not open to projects without the future equipment needed to meet the heating or cooling load.
What GWP benchmarks does the low-GWP path use?
The guide sets one benchmark per equipment type:
| Equipment | GWP benchmark | 1 point at or below | 2 points at or below |
|---|---|---|---|
| Heat pump service hot water heaters | 1,400 | 1,120 | 700 |
| HVAC; data center and IT cooling; process chillers and ice rinks | 700 | 560 | 350 |
| All other process refrigeration (retail, industrial, cold storage) | 300 | 240 | 150 |
The thresholds are 80% and 50% of each benchmark, which is how a single-type project reads them; projects with several equipment types compare weighted averages. Teams that cut refrigerant charge per unit of capacity can use adjusted benchmarks.
What does the leak-limit option require?
Design, installation and operation all count:
- Design: self-contained equipment with no field-installed piping for any refrigerant above 700 GWP and for at least 80% of the project’s total refrigerant GWP; automatic leak detection in fully enclosed spaces with equipment holding more than 100 tCO2e of charge.
- Installation: brazed or press-type fittings on field-installed refrigerant piping.
- Operation: a refrigerant maintenance plan with a named oversight party, inventory updates, charge and leak-rate tracking, certified technicians, annual audits of leak detection systems and a maximum repair time.
| Equipment charge (total GWP) | Minimum leak-check interval without automatic detection |
|---|---|
| 50 tCO2e or less | Every 24 months |
| 50 to 500 tCO2e | Every 12 months |
| More than 500 tCO2e | Every 3 months |
If annual recharge or leakage exceeds 1%, testing and repair frequency doubles.
How do the refrigerant points fit in the Energy and Atmosphere category?
They are a small slice. Energy and Atmosphere is worth 33 points in New Construction and 27 in Core and Shell; Enhanced Refrigerant Management is worth 2 in each, and the Electrification credit next to it is worth 5 and 4. Refrigerant choices still matter beyond the credit, because the prerequisite’s inventory feeds the whole project’s carbon story.
Why is this coming up now?
State and federal rules are moving. Washington’s State Building Code Council voted on October 30, 2026 to allow A3 refrigerants in certain HVAC equipment starting May 2027, and industry groups expect other states to follow, as ACHR News reported. EPA’s May 2026 changes to its Technology Transitions rule extended several compliance dates but kept the long-term GWP limits after 2032. Meanwhile heat pumps reached nearly 48% of HERS-rated new homes in 2026, up from about 28% in 2022, so more projects carry refrigerant in their heating systems.
Which LEED education covers refrigerant transitions?
Look for courses that carry GBCI hours first. GreenCE’s free Navigating the HVAC Transition course covers the proposed Technology Transitions Rule amendments, refrigerant transition timelines, SEER2, IVEC and IVHE ratings, and refrigerant safety standards. It carries a GBCI general hour, which counts toward the general portion of a LEED credential (24 of a LEED AP’s 30 hours, 12 of a Green Associate’s 15), plus AIA HSW/LU credit.
Frequently asked questions
Can a project combine the credit options?
Yes. The options are joined by “and/or,” but the credit tops out at 2 points.
Does the prerequisite ban refrigerants above 700 GWP?
No. It requires evaluating alternatives for them during design and bans HCFCs only in new equipment.
Does existing equipment count?
Yes. The prerequisite’s inventory and leak checks cover existing refrigerant equipment owned by the building owner as well as new equipment.
How does district energy work?
Projects on district energy meet the credit at the district facility or follow the guide’s additional guidance.
Is there a LEED-specific hour on this topic?
The GreenCE course above carries a general hour. Check the LEED Specific course list for LEED v5 energy courses tagged with your specialty.
Why this matters for your continuing education
Refrigerant decisions now sit at the intersection of LEED points, state codes and federal phase-down rules, and they change faster than rating systems do. A general hour on refrigerant transitions keeps a LEED professional current between LEED-specific courses. GreenCE reports GBCI hours for its online courses and webinars to GBCI, so LEED professionals who finish them do not need to self-report those hours.
Sources
- U.S. Green Building Council, LEED v5 Reference Guide for Building Design and Construction, July 2026 Edition: scorecard, p. 1; Fundamental Refrigerant Management (EAp5), p. 85; Enhanced Refrigerant Management (EAc7), pp. 123–125 (owner’s reference file, GreenCE LEED v5 Reference Files)
- ACHR News — Midterm Results Could Accelerate Push for A3 Refrigerants (Nov 20, 2026)
- ACHR News — Study: Heat Pump Adoption Surges in New Construction (Nov 23, 2026)
- Holland & Knight — EPA Finalizes Changes to Technology Transitions Provisions (May 26, 2026)
- GreenCE — Navigating the HVAC Transition course
- GreenCE — How do I report my CE hours?
- GreenCE — How many hours do I need to maintain my credential?
- USGBC — Credential Maintenance Program Guide
- GreenCE — LEED Specific Courses